Friday, July 26, 2013

Progress...

Floors are up, much of the tile is in the dumpster, kitchen is out, bathrooms are on their way out, concrete cleaner and stain products are in-hand (UPS made the acid leak a bit...for shame), and I've got a gas plumber coming out this afternoon to take a look at the kitchen and see about plumbing to the stove.  I bought a craigslist tablesaw (a good Grizzly with a dust collector) so I'm stoked about cabinets.  Onward.

No comments:

Post a Comment